NSWS application checklist, project approvals pack

The National Single Window System is a front end. It does not decide anything, it does not shorten a statutory timeline, and for a good many departments it is a redirect rather than an integration. The trap is telling a client the clock started when the application was submitted on NSWS, the departmental clock starts when the department accepts it, and a deficiency letter resets it.

Length
3 pages
Blanks to fill
138
Files
Word and PDF
Law stated to
16 September 2026

What it covers

  1. 1NSWS application checklist, project approvals packNational Single Window System · complete before filing, and keep as the project's approvals register138 blanks

Read the opening

The first part of the format, as it downloads. Blanks are highlighted.

National Single Window System — pre-filing checklist and approvals register

Client: [Company name] CIN / Udyam: [Client's CIN or Udyam number] Project: [Project name] Prepared by: [Name of preparer] Date: [Date of the checklist]

PART 1 — PROJECT FACTS THAT DRIVE THE APPROVALS LIST

Particular

Detail

State / district / taluka or block; village and survey or plot numbers

[____]

Industrial park or estate, and the zone or category it falls in for State incentives

[____]

Activity, product and NIC code(s)

[____]

New unit or expansion; installed capacity

[____]

Land area, built-up area, number of floors, building height

[____]

Project cost and means of finance

[____]

Connected power load and source; DG capacity

[____]

Water requirement and source (surface / ground / industrial supply)

[____]

Effluent and emission profile; hazardous substances stored or used, with quantities

[____]

Employment — total, women, and workers in hazardous processes

[____]

Target date for construction start, commissioning and commercial production

[____]